1. <sub id="acb5e"></sub>

            <form id="acb5e"><source id="acb5e"><option id="acb5e"></option></source></form>

                LD System

                Product Overview

                LD System


                The LD is our most sold dilution refrigerator system. It has best-in-class heat exchangers with superior performance. The LD400 system typically provides more than 15 μW at 20 mK on the experimental flange with only 18 litres of helium-3. In addition, it has a high cooling power of ~ 0.5 mW when operated at 100 mK. This well-engineered dilution refrigerator has a clean and open design with sensitive parts well protected and out of reach for the user – minimal risk of damage during installation of experimental equipment. A single push of a button initiates a fully automated cool-down sequence from room to base temperature.


                In addition:


                Nine LOS Access Ports


                All line-of-sight ports reach from room temperature to mixing chamber.

                • 2 x KF63 slotted in all flanges
                • 5 x KF40 including central port
                • 2 x KF16


                Large Experimental Space


                MXC Flange Diameter: 290 mm | 11.42″

                Off-center placed dilution unit maximizes useful space on all flanges. Open design permits easy experimental access without being obscured by heat exchangers or system support structure


                Superior Performance


                • Base temperature well below 10 mK
                • Fast cool-down: < 24 hours to 10 mK


                Temperature Controller


                The Bluefors Temperature Controller enhance the user experience of our cryogenic systems. With a modern and intuitive user interface, you gain direct control and overview of the system’s temperature status.

                The Bluefors Temperature Controller is fully-integrated to all dilution refrigerator systems delivered from early summer 2020.


                Read more about the Temperature Controller here.


                Low Total Cost of Ownership


                Oil-free pumps and compressors in gas handling unit guarantee minimal maintenance requirements with service interval up to 3 years. The systems employ only high quality components such as Pfeiffer Vacuum pumps and pressure sensors, VAT vacuum valves and bellows.



                Options

                Options


                Vibration Isolation


                We offer improved vibration isolation for experiments that are particularly sensitive to low frequency vibrations (< 1 kHz).

                • Basic vibration isolation frame
                • Active vibration damping
                • GHS isolation frame
                • Pulse tube pause system


                Optical Ports


                We offer direct optical access to the sample space. The optical ports can be equipped with different window materials and are available in different sizes and configurations. With four 0.5″ optical ports, equipped with our standard fused silica windows, our DR systems still reach a base temperature of < 15 mK.


                Magnetic Shielding


                We offer magnetic shielding that can be fitted directly to the system (e.g. a magnetic shielding metal cylinder with one end closed inside the lower section of the vacuum can). For magnetic shielding we work together with Amuneal Manufacturing Corp.


                Additional Radiation Shields


                We offer the possibility for additional EM shielding around the sample space. These shields can be attached to the mixing chamber plate (LD and XLD) and the cold plate (XLD). Standard shields are made from gold-plated copper. Other materials and platings are available upon request.


                Long-Life Cold Trap


                We have developed a unique long-life cold trap that allows for continuous operation of the system for up to three years. The trap is integrated with the system and does not need any cryogenic liquids to operate (care-free).


                4K Heater Kit


                Fully automated fast warm-up option, which allows overnight warm-up for our standard LD systems.


                LN2 Pre-cooling Loop


                Engaging LN2 pre-cooling loop with an external source of liquid nitrogen allows to reduce the cool-down time by ~ 40% in case of a basic system.


                Helium battery


                We have developed a solution which enables running experiments at dilution refrigerator temperatures for a limited time with the pulse tube cryo-cooler switched off. Helium gas is condensed into a container installed at the 4K flange. Once the container has been filled with liquid helium, the pulse tube can be switched off and by pumping on the reservoir the 4K flange is cooled sufficiently for the dilution circuit to continue operating. Since this mode of operation involves both a mechanical cryo-cooler as well as cryogenic liquids we call it hybrid cooling. The battery performance is characterized by the hold time i.e. how long the dilution unit can be operated while the pulse tube is switched off. For an empty LD cryostat the hold time is approximately 3.5 hours. Due to the increased heat load at the 4K flange the hybrid system is not compatible with a superconducting magnet and any experimental wiring that would increase the heat load to the 4K flange will also decrease the hold time. In practical cases the hold time is between 2 to 3 hours.


                Service Packages and Extended Warranty are available upon request

                Technical

                Technical Specifications


                Note: Cooling power is measured on the experimental flange outside MXC.


                LD250

                GUARANTEED
                EXPECTED

                Base temperature

                10 mK
                8 mK

                Cooling power @ 20 mK

                12 μW
                14 μW

                Cooling power @ 100 mK

                250 μW
                300 μW

                Cooling power @ 120 mK

                360 μW
                400 μW

                Cool-down time to base

                24 hrs
                22 hrs


                LD400

                GUARANTEED
                EXPECTED

                Base temperature

                10 mK
                8 mK

                Cooling power @ 20 mK

                14 μW
                16 μW

                Cooling power @ 100 mK

                400 μW
                450 μW

                Cooling power @ 120 mK

                575 μW
                650 μW
                Cool-down time to base
                24 hrs
                22 hrs


                Performance

                Performance Graphs

                Above are cool-down curves for three different configurations of LD systems measured with calibrated resistance thermometers.


                System 1: basic LD with LN2 pre-cool

                System 2: basic LD

                System 3: LD with 100 mm extra sample space, MXC shield, additional sample mounting plate and large amount of DC and RF cabling.


                Pulse pre-cooling sequence (see spots 2 and 3) is one of the key points in reducing the cool-down time. Because we do not use exchange gas some parts of the DR unit stay ‘hot’ on cool down, which prevents condensation of the mixture. By repeatedly admitting the mixture from the tanks through the low impedance still side of the DR and then pumping it out again, these hot spots are effectively cooled down.


                Typical Layout

                Typical Layout

                Each of our systems is designed to be installed to a specific location defined in advance. A separate layout drawing is made for each Bluefors system, which should always be referred to for exact dimensions.


                Requirements

                Technical Requirements

                The basic requirements are 3-phase electricity, cooling water, compressed air. The full list of requirements and specification details can be found in the Pre-Installation Guide, please contact our sales team for a copy.


                https://bluefors.com/products/ld-dilution-refrigerator/#top

                LD System
                長按識別二維碼查看詳情
                長按圖片保存/分享
                詢盤

                咨詢表單:

                • 請輸入驗證碼

                咨詢內容:


                你還沒有添加任何產品

                加入成功

                Leave a message

                • 姓名 *

                • 電話 *

                • 郵箱

                • 您的需求信息

                • Submit

                • 驗證碼
                  看不清?換一張
                  取消
                  確定

                賽澔(上海)儀器有限公司


                SCIKRO



                賽澔(上海)儀器有限公司

                電話:+86-21-6913 3626

                           +86-21-6913 3296

                傳真:+86-21-6913 3227

                郵箱:info@scikro-instru.com

                地址:上海市徐匯區桂平路555號45棟208室

                Copyright ©2019 賽澔(上海)儀器有限公司版權所有     技術支持:金桔建站    滬ICP備19040421號-1    滬ICP備19040421號-2   滬ICP備19040421號-3   滬ICP備19040421號-4  

                添加微信好友,詳細了解產品
                使用企業微信
                “掃一掃”加入群聊
                復制成功
                添加微信好友,詳細了解產品
                我知道了
                YOUPORN-极品人体-樱桃成熟时-XXXBBB欧美高潮喷水
                1. <sub id="acb5e"></sub>

                        <form id="acb5e"><source id="acb5e"><option id="acb5e"></option></source></form>